Grizzly Bear Viewing Tours at Knight Inlet Lodge, Glendale Cove, BC, Canada

March 2012

02 March 2012
 

Knight Inlet Ldoge micro hydro report

Posted by:editor

Our micro hydro system has worked out well this winter. With almost 8 weeks of operation we have saved close to 4,000 litres of diesel fuel to date. As we gear up for the 2012 season and our preseason fisheries project we will have to switch to our diesel generator since our electrical requirements will be beyond what our micro hydro can produce. Still all in all we are very pleased with what we have been able to do this winter.

Sign up for our newsletter